Torquing and Tensioning

Controlled bolting procedures for leak-free startups on boilers, pressure vessels and piping.

A startup is only as good as its bolted joints. TC Boiler & Piping crews torque and tension flanged connections to the right values, in the right sequence, so your boilers, vessels and piping start up tight and stay that way.

What We Do

  • Boiler and Pressure Vessel BoltingTight, leak-free connections for reliable operation.
  • Piping System BoltingEvery bolted connection made up correctly before startup.
  • Joint Integrity ChecksConfirming bolts and fasteners are properly loaded.
  • Application-Specific ValuesTorque and tension values matched to each joint and gasket.
  • Scheduled and Emergency WorkRoutine maintenance, turnaround scope or an urgent startup.

Industries We Serve

Oil and gas, refining, chemical processing and power generation.

Why TC Boiler & Piping

16

Specialized services

24/7

Emergency response, 365 days a year

R, S & U

Certified stamps for boilers, vessels and piping

.47

EMR (Experience Modification Rate)

Need a Crew You Can Count On?

Tell us your scope and schedule. We will put the right Pack on it.